The plaster is removed, stone cleaned and joints racked out ready to be repointed and left exposed. The removal of the plaster also revealed a window opening that had been filled in. This has been re opened to re instate the original detail.
Copyright (c) 2014 - Baxter & King Building. All Rights reserved